logo
Utilitek SolutionsOur expertise is your success
  • About Us
  • Expertise
  • Projects
  • Careers
  • Contact
Utilitek Logo
Utilitek Solutions

Utilitek Solutions provides innovative engineering solutions for utility and infrastructure projects across Edmonton, Alberta.

Quick Links

  • About Us
  • Expertise
  • Projects
  • Careers
  • Contact Us

Contact

  • admin2@utiliteksolutions.ca
  • Mon-Fri: 8:00 AM - 5:00 PM MST

Connect

© 2024 Utilitek Solutions. All rights reserved.

Privacy PolicyTerms of ServiceSitemap
← Back to Projects
Critical Medicines Production Centre

Critical Medicines Production Centre

2025Utility DesignUnderground Utility Design

Installation of a 3-phase 600A 4-way 15kV switching cubicle and 2500 kVA transformer for API Critical Medicines.

Project Details

This project included the installation of a 3PH, 600A, 4WAY, 15KV switching cubicle and a 2500 kVA pad mount transformer at 9430 17 AVE. Underground cables were fused and spliced using 200A elbows, connected to customer-installed handholes and bases. HDD boring was performed to install primary ducts with cable details recorded for commissioning and coordination.

Grounding remediation and verification ensured a resistance of less than 6 ohms, with outage coordination and site access scheduled through client contacts.

Outcomes

  • Installed 2500 kVA padmount transformer
  • HDD installation of 63m of 1-4" PRI duct
  • Terminated and fused primary cables using 200A elbows
  • Ground remediation to < 6 ohms as per spec
  • Included coordination with EPCOR and Syncrude

Interested in similar solutions?

Our team specializes in substation modernization projects with minimal service disruption.

Related Projects

Mill Creek West

Mill Creek West

Utility Design, Underground Utility Design, Industrial Power Systems

Warehouse Park

Warehouse Park

Utility Coordination, Underground Utility Design, City of Edmonton